Table 2

Rosetta mission reference periods for the detailed data analysis of the QCMs.

Time period Dates T QCM1 T QCM5 Raw QCM1 Isoth QCM1 Raw QCM5 Isoth QCM5
(UT) (°C) (°C) (N of points) (N of points) (N of points) (N of points)
        
Prelanding init: 06/08/2014 21.5 23.5 53 346 9110 53 347 9414
and bound orbits fin: 05/02/2015
               
Flybys init: 05/02/2015 21.5 23.0 15 156 2232 15 156 2161
fin: 31/03/2015
               
April–May init: 14/04/2015 21.5 23.0 13 561 1698 13 561 1856
(post 2015 equinox) fin: 31/05/2015
               
Perihelion init: 01/06/2015 28.0 28.0 43 076 4505 43 076 5129
fin: 31/10/2015
               
Post-perihelion nit: 01/11/2015 23.0 26.5 13 456 4218 13 456 6826
to 2016 equinox fin: 19/03/2016
               
End of mission init: 20/03/2016 21.5 23.0 53 384 10 559 53 384 12 141
fin: 30/09/2016

Notes.The reference time periods for the evaluation of the dust fluxes measured by QCM1 and QCM5 are reported. Column description: name of the considered period; initial and final date of the period; most frequent temperature for QCM1; most frequent temperaturefor QCM5; number of raw data for QCM1; number of isotherm data QCM1; number of raw data for QCM5; number of isotherm data QCM5.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.