Table 4
Slopes of size vs. color and size vs. fmax relations.
Color slope (× 103) | fmax slope (× 107) | |||
|
||||
Band | x | y | x | y |
|
||||
g | −7.7 ± 0.4 | −6.6 ± 0.5 | 0.44 ± 0.04 | 0.60 ± 0.04 |
r | −2.1 ± 0.3 | −2.1 ± 0.5 | 0.52 ± 0.03 | 0.54 ± 0.03 |
i | −2.2 ± 0.3 | −2.9 ± 0.5 | 0.34 ± 0.02 | 0.42 ± 0.03 |
i2 | −3.1 ± 0.4 | −3.5 ± 0.5 | 0.43 ± 0.04 | 0.50 ± 0.04 |
z | 0.1 ± 0.3 | −0.1 ± 0.5 | 0.44 ± 0.03 | 0.48 ± 0.03 |
Notes. Slopes of fitted straight lines of Fig. 20 for all five bands along x and y directions. Color slopes are broadly compatible along x and y, and also broadly compatible with the ones provided in Table 2. The color-corrected fmax slopes are all slighly larger along y than along x, and do not vary significantly across bands. Uncertainties are to be regarded with some caution, because the considered effects are small and fitted values of the slopes depend on fitting intervals.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.