Fig. 4

image

Download original image

Progression of optical observations over the full KiDS survey, for pointings within the final 1347 deg2 footprint. The total number of DR5 pointings is shown as the dashed grey line. The figure demonstrates the slow initial progress made by the survey, whereby only ~5% of planned r-band observations were completed in the initial 18 months of data-taking, prompting changes in the queuing of (in particular) the dark-time observations. Conversely, at the end of the survey, the complete second-pass of i-band observations (designated i2) was completed in roughly the same time span.