Open Access

Table 3

Parametrization of the VIE2020 and VIE2022b solutions.

Parametrization options
Clocks piece-wise linear offsets (PWLO) with time interval 1 h with relative constraints 43 ps (13 mm) between offsets, one rate and quadratic term
Baseline clock offsets offset without constraints at selected baselines
Zenith wet delay PWLO with time interval 30 min with relative constraints 50 ps (15 mm) between offsets
Tropo. gradients PWLO with time interval 3 h with relative constraints 0.5 mm between offsets
*ERP PWLO with time interval 24 h with relative constraints 10 mas
fixed for networks with less than four telescopes
*Celestial pole offsets PWLO with time interval 24 h with relative constraints 0.1 µas
fixed for networks with less than four telescopes
*Weighting database weights (1/uncertainties) + elevation-dependent weighting

Datum definition

CRF NNR to ICRF3 defining sources except 0700-465, 0809-493 (see comment in Sect. 4)
TRF NNT/NNR on coordinates and velocities to ITRF2014 on 21 stations for VIE2020
NNT/NNR on coordinates and velocities to ITRF2020 on 21 stations for VIE2022b

Notes. The asterisk denotes that the analysis setting is different from that of our ITRF2020 contribution.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.