Open Access

Fig. 11

image

Download original image

Cylindrical Stokes-I power spectra ratio after DD calibration (top) and GPR foreground removal (bottom) of the flanking field to the NCP field. The dashed lines, from bottom to top, correspond to the 5° (primary beam), 20°, and 90° (instrumental horizon) delay lines from the phase centre. Red indicates excess power from the flanking field and blue indicates excess power from the NCP field. Some bad data are flagged at the bottom. From top to bottom, the residual foregrounds below the 20° delay line (i.e. excess power from the flanking field) are largely removed after GPR foreground removal.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.