Fig. 10

Download original image
Cylindrical Stokes-I power spectra after DD calibration (left) processed by the standard LOFAR-EoR pipeline with SAGECAL and GPR foreground removal (right) of a single observation night on the NCP. The dashed lines indicate the 5° (primary beam), 20°, and 90° (instrumental horizon) delay lines from the phase centre (from bottom to top). Some bad quality data are flagged on the right.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.