Fig. 1

Download original image
Experimental setups: (a) thin film holder showing interference fringes after deposition. The quartz is placed at the center of the holder. (b) Load lock system with manipulator for changing coated quartz crystals. (c) View of the setup mounted on the ARAMIS beam line. (d) View of the samples in the irradiation chamber at M3-beamline of the GSI M-branch including the microbalance and movable IR window.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.