Table 4.
Estimates of the number of nights in which the IGM tomography survey with the MOS instrument on the ELT needs to be carried out in order to achieve the scientific goals outlined in this paper.
Mode | R = 1000 | R = 2000 |
---|---|---|
VIFU | 92 | 180 |
HMM-VIS | 24 (34) | 45 (63) |
Survey speed ratio | 0.3 | 0.3 |
Notes. The estimates are given for the two observation modes (VIFU and HMM-VIS) and the two configurations studied here. The numbers in parentheses indicate the estimates if the observations are conducted under poorer seeing conditions (see the main text in Sect. 4.2.2). The third line gives an independent estimate of the survey speed ratio of the two modes.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.