Fig. B.2
Determination of the minimum time for the ejection of component C5. We fit the first peak flux of component C5 of 3C 279 using the precession model. The peak flux corresponding to an ejection at to ≈ 1998.15 is shown (dash line), it is too early by at least 8 months. The precession model can fit the position of the first peak flux for to ≥ 1998.80 (solid line).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.