Free Access
Fig. 18

The EMIR system in the 30-m telescope receiver cabin. Besides the annotated elements, one can see, on the right, part of the Nasmyth mirror that maps the telescope axis to a fixed reference frame, and on the left, the HERA 1.3 mm band 2 × 9, beam receiver as well as one of the project team members.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.