Table 5
Best-fit parameter values for the blurred reflection model.
Mrk 509 | ||||||||||
Obs. | Γ | C(10-3) | log ξ | Creflionx(10-6) | Ebroad(keV) | Cbroad(10-5) | σbroad(keV) | R | χ2/d.o.f. | prob |
|
||||||||||
2+3+4 |
![]() |
![]() |
![]() |
![]() |
– | – | – |
![]() |
915/733 | 5 × 10-6 |
2+3+4 |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
756/730 | 0.25 |
|
||||||||||
Mrk 841 | ||||||||||
Obs. | Γ | C(10-3) | log ξ | Creflionx(10-6) | Ebroad (keV) | Cbroad(10-5) | σbroad (keV) | R | χ2/d.o.f. | prob |
|
||||||||||
1+2 |
![]() |
![]() |
![]() |
![]() |
– | – | – |
![]() |
730/704 | 0.24 |
Notes. Distant reflection is modelled using reflext, whose normalisation parameter is fixed to reproduce the observed narrow Fe Kα line (see Sect. 3.3). A Gaussian function is included in the model, for the narrow Fe Kβ emission line, with parameters fixed as in Table 2. For Mrk 509, the best-fit results including a broad Gaussian emission line are also shown. reflionx and power-law normalization parameters C are in units of keV-1 cm-2 s-1 at 1 keV; ionisation parameter ξ is given in units of erg cm s-1; the line normalization parameter Cbroad is the integrated number of photons cm-2 s-1 in the line; σ is the line width expressed in keV. The R parameter is defined as the ratio of the flux of the unabsorbed reflected component to the total unabsorbed flux (evaluated between 0.3 and 12 keV). The two-phase warm absorber parameters are constrained within the range evaluated with the double Comptonisation model (Table 4). The last two columns give the ratio of the chi-squared value to the number of degrees of freedom and the associated probability.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.