Fig. 11

Download original image
Comparison between two different GIANO-B ms1d spectral orders, before (navy) and after (red) Molecfit correction. The left panel refers to the 34th spectral order, where the correction is successful. The right panel refers to the 41st spectral order, where correction does not work properly as telluric lines are saturated in this wavelength region. We did not consider the 41st spectral order and similar ones in our analyses and discarded them.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.