Open Access

Table 1.

Summary of follow-up observations during the course of the MUCHFUSS project.

Date Nights Telescope & Instrument Resolution [λλ] Coverage [Å] Observer
2015/08/20–2015/08/22 3 ING-WHT+ISIS 2000 3440–5270 T. K.
2015/09/04–2015/09/06 3 CAHA-3.5m+TWIN 4000 3460–5630 M.S., S.K.
2016/12/27–2016/12/31 3 ING-WHT+ISIS 2000 3440–5270 S. B.
2017/04/18–2017/04/21 4 ESO-NTT+EFOSC2 600 3270–5240 S. K.
2017/07/24–2017/07/26 3 ING-WHT+ISIS 2000 3440–5270 D.S., S.G.
2018/01/03–2018/01/05 3 ING-WHT+ISIS 2000 3440–5270 S. B.
2015, 2016, 2019 3.5 ESO-VLT+X-shooter 4000 3000–10 000 Service
2017/2018 2.5 GTC+OSIRIS 1000 3600–7500 Service
2018/05/15 1 Keck+ESI 7000 4000–10 000 T. K.

Palomar-5m+DBSP (a) 1500 3800–5700 T. K.
Keck+LRIS (a) 900 3200–5600 T. K.

Notes.

(a)

Observations obtained as backup during other projects. The spectra were reduced with different standard software packages such as IRAF and MIDAS. The LRIS, ESI and X-shooter spectra were reduced using pipelines provided by the Mauna Kea observatory and ESO, respectively.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.