Open Access

Table 1.

LOFAR observation details.

Project code LC12_012 (PI R. Gilli)
Observation dates 07–15/07/2019, 04/10/2019, 15/11/2019
Telescope configuration HBA Dual inner
Central Frequency 144 MHz
Bandwidth 47 MHz
Channel width 12.2 kHz
Integration time 1 s
Observation duration 4 × 4 h
Polarisation Full Stokes
Primary calibrator 3C 295

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.