Table B.1.

List of spacecraft operations impacting EPD.

Maneuver Start Date Start Time End Date End Time Sensor Comment
SA 2020-08-30 04:26:45 2020-08-30 04:28:15 STEP straylight
SA 2020-09-30 12:31:00 2020-09-30 12:38:00 STEP straylight
SA 2020-10-11 15:02:00 2020-10-11 15:10:00 STEP straylight
SA 2020-11-03 23:48:00 2020-11-03 23:55:00 STEP straylight
SA 2020-11-11 10:00:00 2020-11-11 10:02:00 STEP straylight
SA 2020-11-11 10:27:00 2020-11-11 10:29:00 STEP straylight
SA 2020-11-24 19:29:00 2020-11-24 19:31:00 STEP straylight
SA 2021-05-02 00:05:57 2021-05-02 00:25:57 STEP potential straylight.
SA 2021-02-09 19:49:50 2021-02-09 19:59:50 STEP potential straylight.
SA 2021-04-19 08:43:07 2021-04-19 08:53:07 STEP potential straylight.
SA 2021-05-25 08:56:15 2021-05-25 09:06:15 STEP potential straylight.
SA 2021-06-09 17:13:40 2021-06-09 17:23:40 STEP potential straylight.

Attitude Disturbance 2020-06-14 21:00:18 2020-06-15 03:00:18 SIS SIS HV off
Attitude Disturbance 2020-07-13 08:57:03 2020-07-14 03:07:03 STEP, EPT-HET, SIS SIS HV off. EPT-HET, STEP off. TCM and roll
ROLL 2020-07-19 03:00:00 2020-07-19 16:16:40 EPD 12 Full 360 roll for MAG
Attitude Disturbance 2020-08-10 08:00:00 2020-08-11 02:10:00 STEP, EPT-HET, SIS SIS HV off, EPT-HET, STEP off
EPD switch off 2020-08-13 19:00:00 2020-08-19 11:00:00 EPD EPD off due to SSMM issue
CSW update 2020-09-07 00:00:00 2020-09-14 00:00:00 EPD EPD off due to CSW update
Attitude Disturbance 2020-09-21 04:58:48 2020-09-21 23:08:48 STEP, EPT-HET, SIS SIS HV off, EPT-HET, STEP off
Attitude Disturbance 2020-10-05 22:11:31 2020-10-06 10:11:31 STEP, EPT-HET, SIS SIS HV off, EPT-HET, STEP off
Attitude Disturbance 2020-10-06 19:43:35 2020-10-07 01:43:35 SIS SIS HV off
Attitude Disturbance 2020-11-02 06:06:35 2020-11-03 00:16:35 STEP, EPT-HET, SIS SIS HV off, EPT-HET, STEP off. TCM and roll
Attitude Disturbance 2020-11-04 20:35:00 2020-11-05 03:05:00 STEP, EPT-HET, SIS SIS HV off, EPT-HET, STEP off, DEICING
EPD Engineering activity 2020-11-19 10:30:00 2020-11-19 13:30:00 EPD ICU patching
VGAM slot 2020-11-30 00:40:00 2020-11-30 11:25:00 SIS SIS HV off
VGAM slot 2020-12-01 00:00:00 2020-12-01 03:00:00 SIS SIS HV off
VGAM slot 2020-12-07 07:45:00 2020-12-07 10:45:00 SIS SIS HV off
VGAM slot 2020-12-13 00:05:00 2020-12-13 03:05:00 SIS SIS HV off
VGAM slot 2020-12-13 17:26:00 2020-12-14 06:35:00 SIS SIS HV off
VGAM slot 2020-12-20 00:05:00 2020-12-20 03:05:00 SIS SIS HV off
VGAM slot 2020-12-20 17:32:00 2020-12-21 10:33:00 SIS SIS HV off
VGAM slot 2020-12-23 00:05:00 2020-12-23 03:05:00 SIS SIS HV off
VGAM slot 2020-12-24 06:40:00 2020-12-24 20:30:00 SIS SIS HV off
VGAM slot 2020-12-26 23:40:00 2020-12-27 18:39:00 SIS SIS HV off
ROLL 2020-12-27 08:00:00 2021-01-03 23:00:00 EPD 130° roll for VGAM
VGAM closest approach 2020-12-27 11:30:00 2020-12-27 13:00:00 STEP STEP off
VGAM slot 2020-12-30 00:05:00 2020-12-30 03:05:00 SIS SIS HV off

Attitude Disturbance 2021-01-01 00:05:00 2021-01-01 03:05:00 SIS SIS HV off
Attitude Disturbance 2021-01-01 18:33:00 2021-01-02 14:30:00 SIS SIS HV off
ROLL 2021-01-07 16:00:00 2021-01-08 05:16:40 EPD 12 Full 360 roll for MAG
Attitude Disturbance 2021-01-11 07:52:57 2021-01-12 03:40:00 SIS SIS HV off
CSW update 2021-01-17 20:52:37 2021-01-24 21:10:43 EPD Payload off due to CSW update
ROLL 2021-02-03 09:42:31 2021-02-03 10:32:31 EPD 1 Roll from 0 to -20
ROLL 2021-02-03 19:57:14 2021-02-03 20:47:14 EPD 1 Roll from -20 to 0
ROLL 2021-02-05 09:51:35 2021-02-05 10:41:35 EPD 1 Roll from 0 to 45
ROLL 2021-02-05 20:06:15 2021-02-05 20:56:15 EPD 1 Roll from 45 to 0
Attitude Disturbance 2021-02-08 04:00:00 2021-02-08 23:07:42 SIS SIS HV off
ROLL 2021-02-18 00:00:00 2021-02-18 16:34:22 EPD 2 Rolls [0,180] [180,0] for RS calibration
ROLL 2021-02-23 00:00:00 2021-02-23 07:17:28 EPD 8 rolls [0,335] in 45 steps for RS calibration
Attitude Disturbance 2021-03-08 08:30:28 2021-03-09 02:50:00 SIS SIS HV off
Attitude Disturbance 2021-04-05 04:00:00 2021-04-05 23:41:37 SIS SIS HV off
Attitude Disturbance 2021-05-03 04:00:00 2021-05-03 10:00:00 SIS SIS HV off
Attitude Disturbance 2021-05-03 15:41:43 2021-05-04 03:41:43 SIS SIS HV off
Attitude Disturbance 2021-06-01 01:34:32 2021-06-01 11:34:32 STEP, EPT-HET, SIS SIS HV off, EPT-HET, STEP off
Attitude Disturbance 2021-06-03 03:06:59 2021-06-03 15:06:59 STEP, EPT-HET, SIS SIS HV off, EPT-HET, STEP off

EPD switch off 2020-03-21 12:00:00 2020-04-21 12:00:00 EPD Covid measures. Payload off
EPD Engineering activity 2020-04-29 02:00:00 2020-04-29 03:30:00 STEP, EPT-HET Upload new config tables STEP, EPTHET
EDP Engineering activity 2020-05-12 01:00:00 2020-05-12 02:30:00 STEP, EPT-HET Upload new config tables EPT-HET
EPD switch off 2020-05-21 12:00:00 2020-05-29 09:00:00 EPD Payload off (SpW overload)
EMC test 2020-06-02 06:00:00 2020-06-02 23:00:00 STEP, EPT-HET EPT-HET and STEP on-off
EMC test 2020-06-03 06:00:00 2020-06-03 13:00:00 STEP, EPT-HET EPT-HET and STEP on-off

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.