Fig. 8

image

Formal uncertainties at G ≃ 15 for sources with a five-parameter solution in EDR3. Top: semi-major axis of the error ellipse in position at epoch J2016.0. Middle: standard deviation in parallax. Bottom: semi-major axis of the error ellipse in proper motion. These and all other full-sky maps in the paper except Fig. 12 use a Hammer–Aitoff projection in equatorial (ICRS) coordinates with α = δ = 0 at the centre, north up, and α increasing from right to left.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.