Fig. 16.

Residual static error variations across time for each of the three example sequence. The duration of a full sequence is 20 m. The black circle indicates the closed loop acquisition during which the LS reference slopes were measured. The labels along the x-axis correspond to the loop configuration: TT represents a dithering acquisition, TS means that the loop was driven by the TS, LS means that the loop was driven by the LS, LG means that the loop was driven by the TS with low gains, and OL means that the loop was open.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.