Table 2.

SWA-HIS ground calibration programme.

Location Dates Configuration Scope of calibration
1 H30 at SwRI Sep–Oct 2015 and Jan–Mar 2016 EA-IS Optimisation of the EA-IS voltages

2 H19 at SwRI Sep–Nov 2016 Complete sensor minus EA-IS Mass (1−56) and energy (0.1−450 keV) response

3 Mefisto at Bern Jan–Feb 2017 Complete sensor Charge (1−4), mass (1−84) and energy/charge (3−60 keV/e) response

4 H19 at SwRI Mar–Apr 2017 Complete sensor Geometric factor