Free Access

Fig. 4.

image

Left: new instrument layout at GREGOR. GRIS (yellow) with the SJ system (green box above GRIS) are the only optics that remain in the same place, but all original instrument combinations remain. The AO is now horizontal and the new KIS FPI is drawn toward the window. The empty tables are for temporary visitor setups and for GFPI/HIFI. Right: photo of the setup as installed in March 2020. The red line traces the beam.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.