Open Access

Table 1

Setup of the ALMA observations.

Conf. Date of tstart (a) Na (b) Baseline tint (d) pwv (e) Calibrators (f) Beam (g)


observation (UTC) range (c) B A P maj. min. PA
(yyyy-mm-dd) (hh:mm) (m) (min) (mm) (′′) (′′) (°)
1 2015-12-29 08:42 40 15–310 34 0.4 1 2 3 1.0 0.80 9
2015-12-30 07:56 39 15–310 34 0.6 4 2 3 1.1 0.79 −4
2 2016-06-16 22:37 38 17–704 46 0.9 1 4 3 0.51 0.30 30
2016-06-17 23:31 36 17–650 46 0.6 1 4 3 0.58 0.31 42
2016-06-18 01:02 36 17–650 46 0.5 1 4 3 0.63 0.32 65

Notes. (a) Start time of observation. (b) Number of ALMA 12 m antennas. (c) Minimum and maximum projected baseline separations. (d)On-source integration time. (e) Precipitable water vapour content of the atmosphere. (f)Bandpass (B), amplitude (A), and phase (P) calibrators. The calibrators are: 1: J1427-4206, 2: Callisto, 3: J1058-8003, 4: J1107-4449. (g) Major and minor axes (FWHM) and position angle East from North of the synthesized beam at 345.8 GHz.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.