Free Access

Fig. 26

image

Top panel: projected eccentricity, measured by the deviation | μ2μ1−0.5 | of the eclipse separation in phase with respect to 0.5, versus orbital period for all sources with and that have two significant eclipse candidates in their two-Gaussian model (with the criterion ΔEcl1BIC > 50 and ΔEcl2BIC > 50). Bottom panel: same as the top figure, but zoomed on short orbital periods on a linear scale.

This figure is made of several images, please see below:

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.