Free Access

Table 2

Estimated values of the “fluctuation factors” (a measure of the uncertainty) in the rate coefficients, given as factors of the rate coefficients in Table 1.

Initial/final initial/final state
state 3s2 1S 3s4s 3S 3s4s 1S 3s3d 1D Mg++H

3s2 1S 1.5 1.2 1.2 1.2 1.2 1.3 1.2
0.6 1.2 1.2 1.2 1.2 1.3 1.2
0.8 0.8 1.4 1.2 2 1.3 2
3s4s 3S 0.8 0.8 0.8 1.2 2 1.3 1.2
3s4s 1S 0.8 0.8 0.8 0.8 1.2 1.4 1.2
3s3d 1D 0.8 0.8 0.8 0.8 0.8 3 5
0.4 0.4 0.4 0.4 0.4 0.3 6
Mg++H 0.8 0.8 0.8 0.8 0.8 0.2 0.2

Notes. Numbers above the main diagonal are the maximum values of the fluctuation factor for each transition, while numbers below the main diagonal are the minimum values for the same transition.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.