Free Access

Table 1

Overview of GMRT observations on the Boötes field.

Date June 3, 2005 June 4, 2005

LST range 12–20 h 10–19 h
Local time rangea 20:00–04:00 18:00–03:00
Time on target 359 min 397 min
Primary calibrator 3C 286 3C 286
Time on calibrator 94 min 108 min

Integration time 16.8 s
Polarizations RR, LL
No. of channels 128
Channel width 62.5 KHz
Total bandwidth 8.0 MHz
Target RA,Dec 14h32m05.75s,  + 34°16′47.5″

Notes. 

(a)

Indian Standard Time (IST) = Universal Time (UT) + 5:30.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.