Free Access

 

 

Table 1:

The results of determination of the relative SED of the variable source.

Band
log $\nu$ $r_{iR} \pm 1\sigma$ $(F_{i}/F_{R})^{{\rm obs}} \pm 1\sigma$ $(F_{i}/F_{R})^{{\rm obs},~ 1} \pm 1\sigma$ $(F_{i}/F_{R})^{{\rm obs},~ 2} \pm 1\sigma$ $(F_{i}/F_{R})^{{\rm corr}} \pm 1\sigma$ $\log(F_{i}/F_{R})^{{\rm corr}} \pm \sigma$
1 2 3 4 5 6 7 8
B 14.833 $0.926\pm0.054$ $0.610\pm0.036$ $0.729\pm0.057$ $0.538\pm0.051$ $0.643\pm0.038$ $-0.192\pm0.025$
V 14.736 $0.941\pm0.022$ $0.786\pm0.017$ $0.816\pm0.031$ $0.802\pm0.024$ $0.802\pm0.017$ $-0.096\pm0.009$
I 14.574 $0.975\pm0.014$ $1.382\pm0.014$ $1.437\pm0.031$ $1.411\pm0.022$ $1.350\pm0.014$ $0.130\pm0.005$

Notes. (3) - Correlation coefficient between fluxes and its error, all values of r are near 1. (4-6) - Observed SEDs of the variable source (4 - all the data, 5 - event 1, 6 - event 2). (7) - Corrected SED of the variable source (all the data). (8) - The same in logarithmic scale.


Source LaTeX | All tables | In the text

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.