Fig. 18

Download original image
Section cutaway overview of the operational areas within the AtLAST telescope. The operational floor, outlined in yellow, highlights the receiver cabin volume. The supply floor, outlined in brown, shows one of the areas reserved for computing equipment, compressors, and other equipment that can corotate in elevation. The blue section in the lower right denotes where the supercapacitors for the regenerative braking system will be housed (Sect. 4.4).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.