Open Access

Fig. 4

image

Download original image

Comparison of the 10 s fringe contrast, obtained across the KLMN bands, between before the group delay controller upgrade when fringe jumps were left uncorrected and after the upgrade when corrected in 82.5 ms. In the uncorrected case, the K-band fringe jump is simulated in the middle of the DIT, the worst case scenario. The K-band fringe jumps correction brings marginal benefits on the sides of the K band, but makes a very significant difference in the LMN bands of MATISSE.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.