Fig. B.2

Download original image
Zeroth moment maps of the H2O 232 GHz (left) and H2O 263 GHz (right) lines. North is up and east is to the left. We note the different color scales. Contours are plotted every 5σ where 1σ = 13.8 mJy/beam⋅ km s−1 for the 232 GHz line and 1σ = 13.92 mJy/beam⋅ km s−1 for the 263 GHz line. The black ellipse in the lower left corner indicates the synthesized beam.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.