Open Access

Fig. 7.

image

Example of the GCS fitting applied to the CME structure seen in white-light images by both STEREO spacecraft (left column for B and right column for A) and SOHO (middle). The fitting was focused on enclosing the cavity and the flux rope of the CME, but not the shock structure.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.