Major mission milestone for eROSITA since the launch of SRG.
Date | Event |
---|---|
2019/7/13, 15:31 MSK(+) | Launch. |
2019/7/13, 17:31 MSK(+) | Insertion into L2 trajectory and separation from Block-DM03 space tug. |
2019/7/13, 17:39 MSK(+) | First eROSITA telemetry received. |
2019/7/22 | First trajectory correction maneuver. |
2019/7/23 | Telescope cover opens. Outgassing period begins. |
2019/8/06 | Second trajectory correction maneuver. |
2019/8/22 | Camera cool-down. Start of camera commissioning. |
2019/9/15 | Commissioning first light with 2 TMs (*) [LMC]. |
2019/10/16-18 | First light with all 7 TMs (*) [LMC]. End of extended commissioning. |
2019/10/18 | Calibration and performance verification program begins. |
2019/10/21 | Third trajectory correction maneuver and insertion into L2 Halo orbit. |
2019/12/8 | Calibration and performance verification program ends. |
2019/12/12 | All-sky survey begins. |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.