Free Access

Fig. 11.

image

Turbulent magnetic Prandtl number Pmt as a function of the Reynolds number Re for the same sets of runs as in Fig. 6. Pm = 1 is used in all runs. The dotted horizontal lines indicate the extrema of analytical results from different methods; see Table 5.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.