Free Access

Fig. 6

image

Residual interferometer phase for two methods of providing T&F control to the Toruń VLBI station during the experiment of 18 December 2015. The x-axis is UTC and the y-axis is degrees of phase in the middle two sub-bands (colour-coded), vector averaged over the middle 80% of each sub-band. Each four-second integration interval is plotted as a separate point. The baselines are arranged such that those including Toruń are in the right-hand column for each of the T&F control methods.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.