Fig. A.1

Projected two point correlation function wp(rp) measured for 66 VUDS mock catalogs in three redshift ranges. The points correspond to the mean measurement of all 66 mock catalogues, while the errors are computed as their standard deviations. The true wp(rp) computed for the whole parent sample (open circles) is compared to that measured from the observed sample (filled circles). Upper panel: without corrections (2) and (3). Lower panel: after our full correction scheme was applied.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.