Table 2
Recent cyclotron line energy measurements during Main-Ons of Her X-1 by INTEGRAL, RXTE, Suzaku, and NuSTAR.
Satellite | Observation | 35 d | Center | 35 d | observed | max. Flux | Flux normalized | References |
year/month | cycle | [MJD] | phase | Ecyc [keV] | [ASM cts/s]1 | Ecyc [keV]3 | ||
|
||||||||
RXTE | 2009 Feb. | 388 | 54 866.60 | 0.11 | 37.76 ± 0.70 | 5.94 ± 0.50 | 38.14 ± 0.71 | this work |
Suzaku | 2005 Oct. | 353 | 53 648.00 | 0.11 | 38.70 ± 1.00 | 5.03 ± 0.20 | 39.47 ± 1.02 | Enoto et al. (2008) 2 |
2006 Mar. | 358 | 53 824.20 | 0.19 | 38.20 ± 1.00 | 4.70 ± 0.35 | 39.12 ± 1.02 | Enoto et al. (2008) 2 | |
2010 Sep. | 405 | 55 462.00 | 0.07 | 37.83 ± 0.22 | 7.56 ± 0.23 | 37.50 ± 0.22 | this work | |
2010 Sep. | 405 | 55 468.00 | 0.25 | 36.50 ± 1.05 | 7.56 ± 0.23 | 35.17 ± 1.04 | this work | |
2012 Sep. | 426 | 56 192.23 | 0.09 | 37.03 ± 0.50 | 6.60 ± 0.50 | 37.12 ± 0.50 | this work | |
INTEGRAL | 2010 July | 403 | 55 390.00 | 0.05 | 37.50 ± 0.30 | 6.67 ± 0.20 | 37.56 ± 0.30 | this work |
2011 June | 413 | 55 738.26 | 0.08 | 37.34 ± 0.28 | 6.03 ± 0.20 | 37.68 ± 0.28 | this work | |
2007 July/Aug. | 373 | 54 348.00 | 0.25 | 36.50 ± 0.60 | 4.50 ± 0.48 | 37.51 ± 0.62 | this work | |
2011 July | 413 | 55 744.50 | 0.25 | 38.53 ± 0.78 | 7.00 ± 0.20 | 38.44 ± 0.78 | this work | |
2012 Aug. | 421 | 56 019.50 | 0.09 | 38.97 ± 0.38 | 5.03 ± 0.20 | 39.74 ± 0.39 | this work | |
NuSTAR | 2012 Sep. | 426 | 56 192.20 | 0.09 | 37.33 ± 0.17 | 6.60 ± 0.20 | 37.42 ± 0.17 | Fürst et al. (2013) |
Notes. Uncertainties are at the 68% level. 35 d cycle numbering and 35 d phase is according to Staubert et al. (1983, 2013).
The maximum Main-On flux was determined using the monitoring data of RXTE/ASM and Swift/BAT (since 2012 from BAT only); the conversion is: (2–10 keV ASM-cts/s) = 89 × (15–50 keV BAT-cts cm-2 s-1).
The two Suzaku data points from 2005 and 2006 are from Enoto et al. (2008), adjusted to describing the cyclotron line by a Gaussian line profile (see text).
These values refer to this work: normalization to an ASM flux of 6.8 (ASM-cts/s) using the Ecyc/flux relationship (slope of 0.44 keV/ASM-cts/s) of the two-variable fit to the 1996–2012 data set (see Table 4).
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.