Table 3
Time-selected intervals used for the spectral analysis of Chandra and RXTE observations.
Spectrum | Tstart − Tstop | HEG rate | RXTE datasets |
s | cts s-1 | ||
|
|||
Pre-dip | 995–16734 | 24.43 ± 0.04 | 04/03/02 |
Ingress | 16734–17084 | 19.4 ± 0.6 | NONE |
Dip | 17084–17784 | 15.2 ± 0.3 | NONE |
Egress | 17784–18134 | 22.0 ± 0.6 | NONE |
Post-dip | 18134–30065 | 20.30 ± 0.05 | 01/05 |
Notes. Start and stop times are relative to the start time of the Chandra observation corresponding to 2010-08-01 00:32:37 UTC. The HEG rate is the summed (positive and negative) first-order 1.0–10 keV rate (uncorrected for pile-up).The RXTE/PCA spectra used to cover the broad-band spectrum are listed in the last column.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.