Fig. 6

Magnitude-rms plot of a dense pointing in the VMC, where the fitting function turns over before the expected magnitude limit (dotted vertical line). The old expected rms as a function of magnitude is plotted as the dashed line, and the new expected rms as a function of magnitude is plotted as the solid line. Outside of the fitting range, or beyond the turnover point, the rms is a constant. Non-variable stars are shown as dots, and variables are shown as open squares. At the bright end, Y < 12.5 mag, the rms increases due to saturation effects, but this has not been included in the model yet.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.