Table 3: Line identification and equivalent widths (given in Å) between $\sim $1.1-1.8 $\mu $m for AFGL 2298 between 2001 August (PC02) and 2002 May. We estimate errors to be $\pm $20 per cent of the quoted EW. Note that within the observational uncertainty no variability was apparent over the 3.5 month period between 2002 May-July.
Date 08/01 05/02
Transition    
Pa$\beta$ - 250
Br13 - 20
Br12 10 31
Br11 + 50 120
Fe  II(z4F9 - c4F7) 1.6787 bl bl
Br10 25 80


Source LaTeX | All tables | In the text