Free Access

 

 

Table 1:

Differential rotation parameters A and B from Eq. (1) and their standard errors M in deg day-1 for the interactive method.

Year
Month N $A \pm M_A$ $B \pm M_B$ Source
1998 6 89 $14.62 \pm 0.09$ $-3.05 \pm 0.40$ 1
1998 11 48 $14.60 \pm 0.13$ $-3.61 \pm 0.47$ 1
1998 12 175 $14.46 \pm 0.08$ $-3.13 \pm 0.22$ 1
1999 3 161 $14.70 \pm 0.09$ $-3.47 \pm 0.29$ 1
1999 4 199 $14.55 \pm 0.07$ $-2.78 \pm 0.36$ 1
1999 5 250 $14.68 \pm 0.07$ $-3.68 \pm 0.24$ 1
1999 10 149 $14.67 \pm 0.08$ $-3.08 \pm 0.24$ 2
1999 11 184 $14.66 \pm 0.09$ $-3.56 \pm 0.23$ 2

Notes. 1. Brajsa et al. (2001a). 2. Brajsa et al. (2008a). N - the number of traced structures in each month after applying the two-step velocity filter.


Source LaTeX | All tables | In the text

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.