![\begin{figure}
\par\includegraphics[width=16cm]{5231fig1.eps} \end{figure}](/articles/aa/full/2007/30/aa5231-06/Timg71.gif) |
Figure 1:
a) Performance of the Gauss solver, LU solver and
GMRES(50) solver with
,
10-6 or 10-2; dotted lines are extended from the actual timing data for prediction purpose;
diamonds indicate the extra experiments for confirming and correcting the prediction lines;
CPU times for assembling the BEM matrices and extrapolating the fields for 15 layers are also plotted for reference purpose. b) Impact of the setting of
of the GMRES(50) solver on the accuracy of the extrapolated
field. c) Impact of the Krylov dimension m on the
convergence behaviour of the GMRES(m) solver for
.
d) Impact of the Krylov dimension m on the
convergence behaviour of the GMRES(m) solver for
.
|