All Tables
- Table 1:
Expected
for the main detector pairs, corresponding to a flat
background spectrum and an integration time T = 1 year,
a detection rate
and a false alarm rate
.
LHO and LLO stand for LIGO Hanford Observatory and LIGO Livingston Observatory.