All Tables
- Table 1:
Values of the parameters adopted for the test case. The upper
part reports the values of the three free parameters of the model, whereas
the lower part reports the value of the hidden parameters.
- Table 2:
Conversion factors of the line
intensity in erg s-1 cm-2 into the velocity integrated
main beam temperature
observed at the IRAM and JCMT telescopes respectively,
for the five lines observed towards IRAS 16293-2422 (Parise et al. 2005).
Last column quotes the
observed towards IRAS 16293-2422 (Parise et al. 2005).a Predicted flux
from the model simply converted into K km s-1 using the conversion factor.
b Predicted flux derived using an accurate convolution of the signal with the
telescope beam.
- Table 3:
Integration time required to detect the HDO lines with a peak signal over noise of 5 (see text). Note that only one receiver was assumed, so in principle those times can be lowered by a factor
by using a double polarization setup.
- Table A.1:
Predicted fluxes for the IRAS 16293-2422 test case.