Table 4: Summary of the constant parts for H and C20 (Constant part + Permanent tide) used in this study.

  $H_{\mbox{\scriptsize MHB}}$
  $3.2737942 \times 10^{-3}$

$\bar{C}_{20}$
  $-4.841695 \times 10^{-4}$

J2
  $1.0826358 \times 10^{-3}$

 H*
  $3.2671524 \times 10^{-3}$

H* with geophysical
  $3.2671521 \times 10^{-3}$
constant parts  

 H**
  $3.2735556 \times 10^{-3}$


Source LaTeX | All tables | In the text