Table 3:
Delays observed between the various ground stations and IJD (as defined by the VILSPA 2
ground station). A positive delay indicates that for a given OBT, the IJD derived using the ground
station in reference is smaller than it should be. A mean value and its uncertainty is provided for all periods during
which the delays varied significantly. This means that values without reported errors are more accurate than
the others.
Ground Station |
Period |
Delay |
|
(UTC) |
(
) |
ESA Redu |
before 2003-02-26 14:05 |
 |
ESA Redu |
2003-02-26 14:05 to 05-12 15:28 |
 |
ESA Redu |
2003-05-12 15:28 to 05-15 15:25 |
 |
ESA Redu |
2003-05-15 15:25 to 05-21 15:14 |
 |
ESA Redu |
2003-05-21 07:15 to 07-03 14:23 |
 |
ESA VILSPA 2 |
before 2003-05-21 07:15 |
0 |
ESA VILSPA 2 |
2003-05-21 07:15 to 07-03 14:23 |
73 |
NASA DSS-16 |
before 2003-05-21 07:15 |
42 |
NASA DSS-16 |
2003-05-21 07:15 to 07-03 14:23 |
34 |
NASA DSS-24 |
before 2003-04-01 12:00 |
-78 081 |
NASA DSS-24 |
2003-04-01 12:00 to 05-21 07:15 |
54 |
NASA DSS-24 |
2003-05-21 07:15 to 07-03 14:23 |
43 |
All |
after 2003-07-03 14:23 |
0 |