... System[*]
Based on observations with INTEGRAL, an ESA project with instruments and science data centre funded by ESA member states (especially the PI countries: Denmark, France, Germany, Italy, Switzerland, Spain), Czech Republic, Poland, Norway and UK, and with the participation of Russia and the USA.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
... Before[*]
Obtained from unsaturated sections of telemetry. This throughput is not sustainable with actual TLM and the determination has large errors.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
... Time[*]
Dead time assumes 6 $\mu$s ISGRI-VETO strobe length which was in use during these tests.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
... All[*]
This will give an over-estimate of the veto effect since there will be more Compton events generated due to the high rates in PICSIT.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
... All[*]
Includes the effect of Compton events in the previous case to give a better comparison to the no veto case.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
... HV[*]
After optimisation at -6 $^{\circ}$C.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Copyright ESO 2003