- ... System
- Based on observations with INTEGRAL,
an ESA project with instruments and science data centre funded by
ESA member states (especially the PI countries: Denmark, France,
Germany, Italy, Switzerland, Spain), Czech Republic, Poland,
Norway and UK, and with the participation of Russia and the USA.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
- ... Before
- Obtained from unsaturated sections of telemetry. This
throughput is not sustainable with actual TLM and the determination
has large errors.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
- ... Time
- Dead time assumes 6
s ISGRI-VETO strobe length which
was in use during these tests.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
- ... All
- This will give an over-estimate of the veto effect
since there will be more Compton events generated due to the
high rates in PICSIT.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
- ... All
- Includes the effect of Compton events in the previous
case to give a better comparison to the no veto case.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
- ... HV
- After optimisation at -6
C.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.